Netaji Subhash Chandra Bose (Kolkata) International Airport is a civil airport located in West Bengal, (the City of Joy), named in the honour of  Indian freedom fighter Netaji Subhash Chandra Bose. The airport is controlled and operated by the Airports Authority of India (AAI). Spread over an area of 2,460 acres (1,000 ha), Kolkata airport is presently handling approx. 2 Cr. passengers a year and will have a capacity of 2.5 Cr. passengers in current fiscal year. Kolkata Airport has become the 5th airport in India having CAT III landing system.

Jakson successfully completed Supply, Installation, Testing, Commissioning work for 9x1500 kVA (HT), 4x1500 kVA (LT), 2x1010 kVA, 2x750 kVA & 2x250 kVA DG sets in Kolkata Airport.    Jakson was chosen for its ability to provide superior solutions at critical installations requiring 24*7 back up.

Quick Facts

            • Client :  Airport Authority of India
            • Project Location : Kolkata
            • Capacity : 9x1500 kVA (HT), 4x1500 kVA (LT), 2x1010 kVA, 2x750 kVA & 2x250 kVA DG sets
            • Commissioned Date : Jan 2013 - 15 gensets & November 2017- 4 gensets

 

 Business Need

Everyday approx. 1000’s flight take off / land leaving little margin of error at the airport. There is a need for power backup at Airports for running emergency services & equipment’s during the arrival/departure, other common areas including the Automatic Transfer Switch (ATS) room etc. Any breakdown can lead to serious problems & accident resulting in disruption of operations. In the event of grid power failure, diesel generators power plants are an ideal solution for uninterrupted backup for their entire operations. 

Challenge

  1. Complete restoration of power for entire airport operations within specified time of 10 seconds.
  2. Complete restoration of power for CAT III-B instrument landing system (ILS) within specified time of 10 seconds. 

Solution

The scope of work for this project included the following activities which was successfully executed by Jakson

  1. The 9 nos. 11KV 1500 kVA (HT) DG sets along with 4 nos. 415V 1500 kVA (LT) DG sets with complete HT & LT panels, synchronizing panels, NIS & NGR panels with BMS integration. These 13 gensets powered the complete airport lighting and air-conditioning.                     
  1. 2*1010 KVA 415 V DG sets with coil cooler system were installed separately outside the airport for charging the substation.
  2. Recent installation of 2*750 kVA DG sets with ATS panel was installed to provide backup for the CAT III-B instrument landing system (ILS). Both sides of the runway are now equipped to handle low visibility operation (up to runway visual range of 50 meters).

 Mr. Subrata Ray,Vice President (East),Jakson

“This is one of the most prestigious and challenging project we have done in Eastern India. We executed this project through stringent guidelines within the schedule. This is one of the milestone projects and a referral for winning other contracts. This success proved the quality of our product and capability to cater such big projects.”

Find out what’s trending in our part of the world

and what we are doing to make a difference. Subscribe to know more.

Become a Dealer

Please fill in the form below and we will contact you shortly.

  • Change the CAPTCHA codeSpeak the CAPTCHA code
     
Business Query

Field icon image missing
Field icon image missing
Field icon image missing
Field icon image missing
Field icon image missing
Field icon image missing
Field icon image missing
Field icon image missing
Field icon image missing
Field icon image missing

COVID 19 UPDATE

Dear Stakeholders

The outbreak of the COVID -19 pandemic is a cause of concern for all of us. In these extraordinary circumstances, we at Jakson, are closely monitoring this rapidly evolving scenario and have put in place a slew of measures to ensure business continuity, employee safety so as to minimise impact of any disruptions. We remain deeply committed to our customers/stakeholders/employees and would like to update you on some of these actions:

  • Cross Functional Team - A cross functional team comprising members across various functions has been set up to monitor the situation. This team interacts every day to review customer orders, project sites status, supply chain constraints, review updates and take up risk mitigation actions.
  • Limiting Business Trips – While outstation travel has been suspended temporarily, we are encouraging use of video conferencing/skype etc to provide business continuity.
  • Risk Mitigation Plans – We are closely working with our business teams and developing specific contingency plans to minimise disruptions to all our customers.
  • Work from Home for Employees – For the safety of our employees, we are encouraging work from home, while at the same time ensuring sufficient access to data & technology. We also have a skeleton staff presence by rotation supporting the operations wherever its possible
  • Social Distancing – At our offices, strict guidelines are in place to use teleconferencing / video conferencing facilities so as to limit face to face contact. Individual meetings, as and when situation improves, will be limited to 4 people with adequate precautions of maintaining distance. We have a visitor policy for all Jakson facilities and we are encouraging use of alternative communication methods till such time situation normalises.
  • Hygiene & Safety - We are ensuring that we provide a healthy and clean environment to all our employees & visitors wherever premises are not in lockdown. All our facilities are maintaining the highest standards of EHS, keeping premises clean & disinfected, ensuring availability of hand sanitisers in sufficient quantities and providing all employees with masks.
  • Regular Employee Communications - We are ensuring regular employees communications, that update them on the dos and don’ts of keeping safe and healthy. There are also regular advisories on the evolving situation so as to ensure, all guidelines from the govt & ministry of health are complied for from time to time.
  • Employee Motivation - In these testing times, we continue to assure our employees and their families, of our commitment & support irrespective of anticipated business disruptions.
  • Stepping up CSR Activities - We are fully cognisant of the global & India impact of this pandemic and are therefore gearing up to commit a heightened level of participation and support to society through our CSR initiatives. We will keep you updated on these initiatives as well.



Jakson has a rich heritage of 70 years, which has been built on principles of strong commitment, trust & relationship. We wish to reiterate this and remain committed in the belief that together we will tide over the current situation.

We thank you for your association and support.


Warm Regards,

Sameer Gupta, CMD & Sundeep Gupta, VCMD