1 MW rooftop solar PV plant at Maharshi Dayanand University in Rohtak, Haryana

Overview

Jakson Group successfully commissioned a 1 MW rooftop solar power plant at Maharshi Dayanand University in Rohtak, Haryana. Jakson provided complete turnkey EPC services for this project that involved supply, erection, testing, commissioning including warranty, operations and maintenance. This large scale rooftop solar plant comprises two plants of 500 KW each, with a total of 3302 solar panels of 310 Wp installed.

The power generated in the plant will be sold to the University under a 25 year Power Purchase Agreement (PPA) signed between both Jakson and the University. The plant will generate approximately  15 lakh...

Grid connected rooftop solar power plant at President’s Estate (Rashtrapati Bhawan)

Overview

Jakson successfully installed a 508 kWp solar power plant at President’s Secretariat, Rashtrapati Bhawan, New Delhi. The scope of work for this project included design, supply, testing, installation, commissioning and operation & maintenance for 5 years. The plant is grid connected with an integrated net metering facility, complying with Delhi Electricity Regulation Commission’s regulations. The entire project of 508 kWp was installed in rooftops of 5 different buildings within the President’s Estate, in various sizes as per availability of space. Innovative ballast design was used to mount the modules on the concrete rooftops. This eliminated the need...

Rooftop solar PV system at DMRC metro station

Overview

Jakson successfully installed 250 KWP rooftop solar power plant at Pragati Maidan Metro Station, New Delhi. This enabled the station to harness solar energy for various applications at the facility. Scope of work included design, engineering, manufacture, supply, erection, testing and commissioning including warranty, operation & maintenance under RESCO model wherein DMRC would be charged on the actual usage of solar power consumed on a monthly basis for a period of 25 years. In addition to cost benefits, the plant is estimated to offset 270,000 kilograms of CO2 per year significantly contributing to environment protection.